For private owners building in Osun State
Most private building projects are not run by developers but by individuals and families, often building in stages as money becomes available, and often from a distance. The owner relies on a contractor or foreman, sends money in instalments, and sees the building only occasionally, if at all.
This is where things commonly go wrong. Money sent for materials is not spent on those materials; work is rushed or done below specification; stages are declared complete when they are not; and problems are hidden until they are expensive to fix. Building project management gives the owner someone on their side.
Stages of a building project we manage
- Foundation: setting out against the approved drawings, excavation depth, blinding, reinforcement and concrete.
- Substructure and ground floor slab: block work, damp proofing, filling and compaction, termite pre-treatment, reinforcement and casting.
- Superstructure: block work, columns, lintels, beams and upper floor slabs.
- Roofing: timber or steel roof structure, roofing sheets and waterproofing.
- Services: electrical, plumbing, drainage, septic tank or soakaway, water tanks and pumps.
- Finishing: plastering, screeding, tiling, POP ceilings, painting, doors, windows and fittings.
- External works: fence, gate, paving and drainage.
- Completion: snagging, final clean and handover.
Building in stages
If you are building in phases, we help you plan each phase so that money is spent in the right order, the building is protected between phases (for example, roofing before a long pause in the rainy season), and each phase is completed properly before the next begins. We prepare a budget for each stage so you know how much you need before work starts.
Materials and quantities
Material fraud is one of the most common problems on private sites. We check quantities against the bill of quantities, verify deliveries on site, keep a materials record and flag unusual usage. You pay for what your building actually needs.
Reporting you can rely on
You receive regular reports with dated photographs of progress, materials on site and any issues found, together with a summary of money spent against budget. If you only need independent inspection rather than full management, see building supervision.